cladding projects

Saxonbury

Cladding Project

Project Value: £600,000

Timescale: 35 weeks

Project Summary:

Structural works and installation of External Insulation system to high rise tower block, including

BEFORE

AFTER

Warwick Mount – External Refurbishment

Project Value: £500,000

Timescale: 36 weeks

Project Summary:
External repairs and refurbishment to a high rise tower block in Brighton’s kemptown, including installation of rendered external insulation system. Works included:

  • Concrete & Brickwork Repairs
  • External Wall Insulation
  • Replacement Balcony Railings
  • General Decorations to External Areas
  • Landscaping and Fencing

Saxonbury – Cladding Project

Project Value: £600,000

Timescale: 35 weeks

Project Summary:
Structural works and installation of External Insulation system to high rise tower block, including:

  • Demolition of External Brickwork
  • Concrete Repairs to Concrete Beams
  • Brickwork Repairs and Wall Tie Replacements
  • Install METSEC Steel Frame System
  • Installation of External Wall Insulation cladding system (brick slip finish)
  • General Decorations to External Areas

Tyson Place – External Refurbishment Project

Project Value: £500,000

Timescale: 42 weeks

Project Summary:
External Repairs and EWI to high rise tower block in Kemptown Brighton

  • Repairs to External Brickwork
  • Concrete Repairs to Exposed Balcony Slabs & Undercroft
  • Installation of External Wall Insulation Cladding System (with brick slips)
  • General External Decorations & Landscaping
,

Tyfoam Properties – Phase 1-5

Project Value: £2,300,000

Timescale: 4 Years (8 weeks per house)

Works Summary:

  • Concrete and Brickwork Repairs
  • Removal of Cavity “Tyfoam” Insulation
  • Repair/Renew Wall Ties
  • Rebuild Outer Brickwork
  • Install External Wall Insulation cladding system (either brick slip or pebble dash finish)
  • Install New Build-Lite Moulded Window Cills
  • General External Decorations (as required)

Charlton Triangle – Cladding and Refurbishment

Project Value: £3,0000,000

Timescale: 38 weeks

Project Summary:
Refurbishment of a large estate in Charlton, Greenwich owned by Family Mosaic. Works included:

  • Concrete and Brickwork Repairs
  • Boiler Replacements & Flue Extensions
  • Installation of Solar PV
  • Installation of External Wall Insulation cladding system (rendered finish)

Conversion projects

Bristol Estate Conversion

Project Value: £650,000

Timescale: 45 weeks

Works Summary

  • Strip Out
  • Demo and Rebuild External Walls
  • Excavations and Lay Drainage
  • Build Extensions and Retaining Walls (as req.)
  • Structural Repairs (as req.)
  • Construction of External Bin Stores (as req.)
  • New Partitions, Ceilings and Internal Fit Out (incl. new kitchens & bathrooms)
  • General Decorations (Interior & Exterior)
  • Landscaping (incl. new footpaths and plant beds)

BEFORE

AFTER

Tyfoam

Phase 1-5

Project Value: £2,300,000

Timescale: 4 Years (8 weeks per house)